When it is necessary to partially replace the wiring

5 1 1 1 1 1 Rating 5.00 (1 Vote)

When it is necessary to partially replace the wiring

Connection of new power-generating devices

Many customers asked an electrician to connect the boiler, connect the air conditioner, or other power-consuming device.

The house has an old wiring and residents are hesitant to replace it for different reasons.

What works will be done

Usually in such a situation, the electrician proposes to pull a new wiring line. In the houses of varying layouts counter in the hallway or on the landing or in the apartment.

When laying a new line to the consumer is required to take into account the cross-section of the cable. It is necessary to calculate the total load of the object to all electricity consumers. Then the electrician defines - will stand the loading or not the incoming cable. Then electrician produces laying new wiring.

Trust experienced professionals